Fatigue Testing of Railway Tracks with Asphalt Pavement

Project Partners :

  • RFF
  • SNCF INFRA
  • EGIS RAIL
  • COLAS RAIL
  • SOCOTRAS
  • EDILON SEDRA
  • VOSSLOH COGIFER
  • RAILENIUM
  • Université Gustave Eiffel (ex IFSTTAR)
  • CEREMA
  • Objectives

    The objective of this project is to increase the clearance gauge of existing tunnels at a lower cost and with minimal disruption. Railway tracks traditionally consist of an infrastructure layer (earthworks) and a superstructure (ballast, sleepers and rails, supplemented where necessary by track components). The proposed solution involves removing the ballast and sleepers (50 cm thick) and replacing them with an innovative continuous rail support system on a bituminous-bound granular structure. This solution offers the advantages of cost-effective installation, a short curing time and good long-term durability.

    From a technological and scientific perspective :

  • Innovative Application of Asphalt Mixtures
  • Adaptation of Asphalt Material Mix Design Methods
  • Adaptation of Pavement Design Methods.
  • From a Scientific Perspective :

  • The need to reassess these materials in terms of durability and fatigue resistance
  • The solution combining continuous rail support will eliminate the empirical approach traditionally associated with railway track design, while providing a concept that is easier to model than a ballasted track..
  • From an Economic Perspective :

  • Development of a new railway track system, contributing to the international recognition of French expertise in railway track engineering.
  • The issue of tunnel clearance concerns all countries with ageing railway networks.
  • Instrumentation avancée & Internet des Objets

    Loading Prototype

    To carry out testing on asphalt mixtures, a new loading prototype was developed by the SII laboratory. :

    Instrumentation avancée & Internet des Objets
    Instrumentation avancée & Internet des Objets

    Ongoing Tests

    The tests are ongoing: approximately 700,000 cycles have been completed out of the one million expected.